|
DUFA- OFFICE BUILDING - Bucharest-
Location: 4-10, Daniel Danielopolu street, Bucharest
Year: 2004
Area: 5179 sqm
Beneficiary : SC DUFA ROMANIA SRL
General planner: SC ARCHITECT SERVICE SRL(arch. Constantin CIUREA, arch. Daniela BATRANU, arch. Claudia TEODOROVICI)
Special planner: Z GROUP- BIROU DE STRUCTURI SRL(eng. Ion ZAGAICAN, eng. Diana ZAGAICAN)
HVAC installation: ROINSTAR SRL, 3D PROIECT SRL(eng. A.L. DOLINSKI, eng. R. DOLINSKI)
Low voltage : S&B Engineering(eng. Radu DOBRESCU, eng. Bogdan GALINSCHI, eng. Silviu NITULESCU)
Sanitary installation : eng. L SERBU
Electric plant : ing. Vl. ALBERT
Project presentation:
The building proposed is the predominant function of the office and it takes place on 6 levels, basement, ground and 4 floors.
The building presents a knot of traffic in the inner core, around which to develop a space of "open space" with modular bulkhead to meet current needs for flexibility and the outside - a curtain wall aluminum joinery.
Structure strength:
Infrastructure - foundation
Superstructure - the central hub of diaphragms in reinforced concrete pillars, concrete shape, thick and slab floors of concrete beams
|
|